For CIOs, CDOs, and CIDOs

Replace a failing SI workstream in twelve weeks, with the risk on us.

A lower-risk path than your current integrator: named senior experts orchestrating fleets of AI agents, sandbox-first on the stack you already run, with each cycle paid on the outcome, not on hours. We deliver in twelve weeks what incumbents quote at two years.

No obligation. We pick up.

The problem

The T&M trap has a shape. You are living in it.

The incumbent model bills time and stakes nothing on the result. Mobilization runs a year or more before anything ships. Change orders stack, the partner who pitched disappears after kickoff, and the pyramid underneath bills hours against a roadmap that keeps moving. The program carries your name, but the risk sits entirely on your side of the table.

Meanwhile the board wants an AI transformation narrative it can trust, and most enterprise AI never leaves the pilot portfolio. The gap is not model quality. It is the operating model of the vendors building it: nobody in the labor pyramid is paid on whether AI reaches production and changes the number.

In command

Your estate, answering to you.

A CIO commanding holographic enterprise system maps
Command of the estate
A CIO in front of a live enterprise operations wall
Your systems, one picture
A CIO reviewing verified program results with senior staff
Results your board audits

The offer

The SI Workstream Swap Sketch.

Bring the workstream your integrator keeps re-scoping. In one twenty-five minute working call, we map it to a twelve-week, outcome-staked replacement plan you can put in front of your board, whether or not you ever engage us.

  • The workstream mapped to one twelve-week cycle, with the shippable outcome named.
  • The named experts who would run it, listed. Substitutions only with your sign-off.
  • Baseline mechanics your Finance team can validate, the same mechanics that lock in week two of a cycle.
  • The sandbox-first integration path into the estate you already run.

If we then engage, the work starts with the first cycle. Each twelve-week cycle is paid on the outcome it delivers, measured against a baseline your finance team approves. Not on hours.

Let's find the value

No obligation. We pick up.

Risk reversal

Your integrator bills the hour.
We sign for the outcome.

These commitments are written into how Future Works engages, so the risk your board worries about is shared rather than billed by the hour. They are also the mechanics that make the program defensible upward: a baseline Finance signs, and a cycle paid on the outcome, not on hours.

  • 01

    Value-Based Fees

    Fees tied to the value we deliver, measured against a baseline your Finance organization approves. Not the hours spent.

  • 02

    Sub-12-Week Phases

    Every phase ships in under twelve weeks.

  • 03

    Named Senior Experts

    The senior experts in the pitch are the people on the project. Substitutions need client sign-off.

  • 04

    Auditable by Design

    Every request, decision, and result on the ledger.

Proof

AI operationalized at enterprise scale.

We have stood up instrumented operations and shipped production AI inside large-scale physical operations across real-world industries. The mechanism your board sees is the same every time: a named pod, agents owning the volume, and a baseline your stakeholders sign.

Trusted by teams at...

JLL logo with orange globe behindFirst Solar LogoCBRE LogoNextPower Logo SVGGNC LogoStaples Logo Philips Logo SVGRoland Logo In orangeJLL logo with orange globe behindFirst Solar LogoCBRE LogoNextPower Logo SVGGNC LogoStaples Logo Philips Logo SVGRoland Logo In orangeJLL logo with orange globe behindFirst Solar LogoCBRE LogoNextPower Logo SVGGNC LogoStaples Logo Philips Logo SVGRoland Logo In orange
Galactic SVG LogoTritower-Logo svgAstroscale SVG LogoMarkforged LogoVeritone SVG logoBoom SVG LogoGoogle logo with blue, red, yellow, and green lettersGalactic SVG LogoTritower-Logo svgAstroscale SVG LogoMarkforged LogoVeritone SVG logoBoom SVG LogoGoogle logo with blue, red, yellow, and green lettersGalactic SVG LogoTritower-Logo svgAstroscale SVG LogoMarkforged LogoVeritone SVG logoBoom SVG LogoGoogle logo with blue, red, yellow, and green letters
Eventbrite logo in redMake-logo SVGMeritech-logo SVGLast Energy Logo SVGOtoy Logo SVGUrsa Major Logo SVGAmperon Logo SVGEventbrite logo in redMake-logo SVGMeritech-logo SVGLast Energy Logo SVGOtoy Logo SVGUrsa Major Logo SVGAmperon Logo SVGEventbrite logo in redMake-logo SVGMeritech-logo SVGLast Energy Logo SVGOtoy Logo SVGUrsa Major Logo SVGAmperon Logo SVG

Direct line

Swap one workstream this quarter.

Twenty-five minutes. No slides, no obligation. The next twelve-week cycle starts with this call, and a cycle that does not start this quarter is a quarter of value your incumbent keeps billing against.

Let's find the value

No obligation. We pick up.

Frequently asked

Before you swap a workstream.